We are removing the existing steam-powered perimeter heating throughout the school and replacing it with new glycol-fed heating units. This scope includes demolishing and reinstating all associated existing piping and risers, as well as installing new piping as required, along with tying into the existing hot water heating plant in the basement, complete with two pumps and a heat exchanger to circulate glycol. In addition, the ductwork for the dust collectors and the make-up air (MUA) units in the woodshop has been moved into this phase from Phase 1.

 

Kelson mechanical highlights:

Installation of new convectors, wall‐mounted finned heaters, unit heaters, force-flow heaters, ceiling-mounted unit ventilators, fan coil units, two hydronic pumps, one air separator, one expansion tank, one heat exchanger, and all associated glycol fill accessories.