Kelson was hired as a General Contractor to remove and replace 4 roof top units, as well as install 2 heat pumps at Princess of Wales Theatre for Mirvish Productions. This is phase 2 of the renovation, phase 1 was completed by Kelson in the fall of 2015. This project has a small time frame due to the time between shows at the theater, the on-site work is scheduled to be completed in 4 weeks.Β