Kelson was the mechanical contractor for the Hotel Dieu Hospital ramp repair project. This involved installing a completely new glycol heating system for the snow melt ramp. It required the installation of 16,000 feet of tubing, 9 manifold headers, a heat exchanger, recirc pump, glycol make up assembly and new controls complete with alarms. This was an occupied facility with IPAC measures in place.