Intel is located on 8th floor of a 15 story building.Β  Project involves 3 CRAC units and one air compressor for their bench lab to manufacturer computer chips, as well as cooling for a data room.

We are installing a dry cooler with associated pumps on the roof and running risers from the roof down to level 8 for tie in to the CRAC units (CRAC = computer room Air Conditioning).

Mechanical Systems

Installation of 3 Liebert CRAC units
Installation and hoist of DRY COOLER and 2 Duplex pumps skids to the 15th floor
Fast track project in existing building