Renovation includes Back of House (BOH), Washrooms (WR), and Food-Court (FC).

BOH: Install of hot water tank, heat pump
WR: Install of approx. 50 new fixtures (urinals/toilets/sinks)
FC: Install of 3 heat pumps, install of roof-top Make-Up Air Unit, install of new water/gas meters, etc.