- Installation of supporting utilities for 7 new autoclaves o Plant Steam, Clean Steam, Compressed Air, Domestic Water, Drainage and Exhaust Ventilation - Autoclave additions required to meet Health Canada and FDA inspection requirements Autoclaves were installed in existing building with all services to be coordinated through existing ceiling spaces
Mechanical Systems
- Design-Assist with Sanofi Pasteur prior to the start of construction o Constructability analysis and confirmation of routing prior to the commencement of construction o Coordination and development of integrated 3D Model to ensure mechanical services could be installed as shown (within congested ceiling space) - Start-up and commissioning of autoclave systems in a short period of time - Maintain operation of building during renovation (GMP Facility) - Contractor assisted in Field Acceptance Testing (FAT) of Autoclave Equipment