DESCRIPTION: Supply and install 5 Liebert CRAC units in the 6th floor data center located at Sick Kids PGCRL. 2 power distribution units along with a busway system are to be added to power the CRAC units and connect them to the existing BAS system. Provide new process chilled water piping with thermal insulation and balance the system according to the plans and specifications. Provide pumped condensate piping connections for new units. Work to be completed in a hoarded space and space is to be kept clean at all times.

Mechanical Systems

Kelson mechanical highlights: Supply and install CRAC units and connect process chilled water piping to the existing services. As a general contractor, Kelson is responsible to supervise all operations.