Kelson is the prime contractor for University Health Network Toronto General Hospital Eaton Wing renovation project. This includes the replacement of the Air Handling Unit (AHU) Cooling Coil Valve. Kelson was responsible for the cleaning of existing cooling coils, and replacing control valves to improve existing operations. Also, the removal of the HVAC control valve for the cooling coil. This was an occupied facility with infection control procedures in place.