Kelson is the mechanical contractor for the renovation project at the Hospital for Sick Children Burton Wing CDIU. This involves the replacement of piping and pumps for the MRI unit. The purpose of this system was to serve the MRI cabinet with cooled water either with chilled water or city water as a backup. This is an active healthcare facility with IPAC measures in place.