This wasΒ  a complete ventilation upgrade of an existing Aritifact lab where the existing rooftop unit was replaced with a new 8700 ACFM Temtrol unit complete with a 220lb/hour Dri-steam humidifier and remote condenser. All the ductwork was replaced in the two labs and a new prv station was installed off the main steam distribution header to supply steam to the humidifier. All work had to be completed during the summer shut down for the students returning in August.

Mechanical Systems

Kelson mechanical highlights:All the artifacts had to be protected as they were not replaceable and could not be relocated.